Whitchurch Road (A5112) and Battlefield Road in Shrewsbury are to be resurfaced between 19 September and 8 October [2022] as part of…
Shropshire Council Newsroom
Category: Highways, transport and environmental maintenance
1157 Highways, transport and environmental maintenance posts found.
Resurfacing of Whitchurch Road and Battlefield Road, Shrewsbury
Shrewsbury park and ride to stop at Flaxmill Maltings
Shrewsbury’s Harlescott park and ride service is to add additional stops outside and opposite the town’s Flaxmill Maltings, when the newly restored…
Closure of Rhyd Meredith Bridge near Llanymynech for inspection work
The A495 over Rhyd Meredith Bridge near Llanymynech will be closed to vehicular traffic on 16 September [2022] when an inspection of…
Closure of Jubilee Bridge near Baschurch for inspection work
The unclassified road over Jubilee Bridge near Baschurch will be closed to vehicular traffic on 14 September [2022] when an inspection of…
Closure of Perry Farm Bridge near Whittington for inspection work
The C road over Perry Farm Bridge near Whittington will be closed to vehicular traffic on 13 September [2022] when an inspection…
£3.6m Shifnal town centre enhancement to be completed soon
The £3.6m scheme to improve and enhance Shifnal town centre is set to be completed in November [2022], meaning the town will…
Great Ness and Little Ness volunteer litter pickers praised for efforts
A voluntary litter picking group in the Great Ness and Little Ness areas of Shropshire has been praised for their efforts to…
More Shropshire roads to be resurfaced in September
A further seven stretches of roads across Shropshire are set to be resurfaced in September as part of Shropshire Council’s annual resurfacing…
More potholes to be tackled by Multihog machines in September
Shropshire Council’s three Multihog road planer machines will be tackling more potholes and other defects on roads across Shropshire next month [September…
Beatrice Street and Leg Street in Oswestry to be resurfaced
Beatrice Street and Leg Street in Oswestry are to be resurfaced from 8 to 16 September, with work being carried out under…