03/03/2021 - Permalink

Extensive maintenance work completed on A41 at Prees Heath

Related topics: Highways, transport and environmental maintenance / Partner organisations

Extensive maintenance and repair work has been carried out on a section of the A41 at Prees Heath.

Work was carried out during a two-night road closure on 24 February and 25 February 2021, and included:

  • 1,500 square metres of structural patching and resurfacing work.
  • Pothole Texpatching repairs.*
  • Six ironwork gullies raised and repaired.
  • 28 streetlights replaced with energy efficient luminaires, and four sign lights replaced.
  • 200 cats eyes replaced, plus roadmarking and lining works.
  • All gullies within the closure cleaned and emptied.
  • Some road direction signs replaced.

Work was carried out by the partners in the Shropshire Highways alliance – Shropshire Council, Kier and WSP.

This work will reduce disruption of an important and busy section of road that is under constant pressure.

About Texpatching

*Under this new process, potholes are cleaned out, filled with a unique material called Texpatch, then covered with a neat, square patch. This will provide a longer-lasting, smoother, neater finish compared to traditional pothole repairs, and seals up all joints, which should result in an increased life span for the repair.