16/11/2026 - Permalink

Cound Arbour Bridge to close for inspection

Related topics: Highways, transport and environmental maintenance

A principal bride inspection of Cound Arbour Bridge – which carries the unclassified road between the A458 and Cound over Cound Brook – will take place on 24 November [2026].

To enable the inspection to be carried out safely, it will be necessary to close the bridge to vehicular traffic between 7am and 5pm.

During the closure, traffic will be diverted via the A458 and local roads using a signed diversion route.

Every effort will be made to minimise the impact on residents and road users, and access for pedestrians and dismounted cyclists will be maintained throughout the works.

The inspection will be undertaken by Shropshire Council’s maintenance contractor, Kier, with supervision provided by WSP on behalf of the council.

To help keep the public informed, advance warning signs will be erected on site and letters will be delivered to nearby properties.

A ‘principal inspection’ is a detailed close visual inspection carried out every six years.