26/02/2020 - Permalink

Further consultation for Shrewsbury North West Relief Road scheme

Related topics: Highways, transport and environmental maintenance
A still from a new fly-through animation of the new road

A still from a new fly-through animation of the new road

Shropshire Council has announced what is expected to be a final stage of public consultation in its plans for the Shrewsbury North West Relief Road (NWRR), before an application for planning permission is submitted in May 2020.

The NWRR scheme, which now incorporates the previously separate Oxon Link Road scheme, will connect the A5 at Welshpool Road roundabout in the west to the Ellesmere Road roundabout in the north, with new bridges over the River Severn and the Shrewsbury to Chester railway line.

The six-week consultation opens on Monday 2 March and ends on Monday 13 April – and includes exhibitions at four venues across Shrewsbury – giving residents, businesses and road users the opportunity to register their comments.

A map showing the route of the North West Relief Road

A map showing the route of the North West Relief Road

Steve Davenport, Shropshire Council’s Cabinet member for highways and transport said:

“Since we last consulted the public on the proposals for what was previously two schemes, we have been working on the design to incorporate that feedback wherever possible, and also to build in environmental protections, reflecting the studies we have been undertaking over the last three years.

“The result is a combined scheme, which is going to really improve life for communities and road users alike, from Shrewsbury and further afield, improving congestion, air quality and journey times, into and around Shrewsbury.

“We’re looking forward to showing how the North West Relief Road has come along. I encourage people to come to one of the exhbitions and let our team know what they think.”

The exhibitions will provide the opportunity to find out more about: the scheme and its route; access points; environmental impact assessment and mitigations; how the road will look; and provision for cycling, pedestrians and horse riders. The information will also be available on the Shropshire Council website.

Exhibitions will take place at:

Tuesday 10 March – 2pm to 8pm at Emmanuel Church, Mount Pleasant Road, Shrewsbury.

Wednesday 11 March – 2pm to 8pm at Bomere Heath Village Hall, Bomere Heath, Shrewsbury.

Thursday 12 March – 2pm to 8pm at Ego at the Grapes, Welshpool Road, Bicton Heath, Shrewsbury.

Friday 13 March and Saturday 14 March from 10am to 5.30pm at The Big Town Plan Shop, Darwin Shopping Centre, Shrewsbury.

Sunday 15 March from 11am to 4pm at The Big Town Plan Shop, Darwin Shopping Centre, Shrewsbury.

Monday 16 March to Friday 20 March from 10am to 5.30pm at The Big Town Plan Shop, Darwin Shopping Centre, Shrewsbury

A still from a new fly-through animation of the new road

A still from a new fly-through animation of the new road, showing the River Severn viaduct

Information about the scheme, and the consultation will be available online at www.shropshire.gov.uk/get-involved throughout the consultation period.

For more information about the North West Relief Road, go to www.shropshire.gov.uk/nwrr.