03/01/2025 - Permalink

Red Bank Road, Market Drayton to close for maintenance work

Related topics: Highways, transport and environmental maintenance

Red Bank Road, Market Drayton will be closed from Monday 13 to Friday 24 January [2025] for essential maintenance to Red Bank No 1 retaining wall.

The work involves the taking down and rebuilding of a collapsed area of retaining wall and repairs to the drainage outlets.

To carry out the work safely it will be necessary to close Red Bank Road to vehicular traffic 24 hours a day.

When the road is closed traffic will be diverted via local roads by a signed diversion route.

Access for pedestrians and dismounted cyclists will remain available throughout the work.

The work will be carried out by Shropshire Council’s term maintenance contractor, Kier with supervision being provided by WSP on behalf of Shropshire Council.