Lawn No 2 Bridge near Clun: temporary road closure from 27 September
Lawn No 2 Bridge, which carries a ‘C’ classified road over the River Clun, will be closed to traffic from Monday 27 September 2021 for up to three weeks for repairs.
The repair works will involve concrete repairs to the soffit of the structure and provision of new parapet upstands, repairs and painting of the parapet and minor resurfacing of the carriageway.
Unfortunately, in order to carry out the proposed work safely, it will be necessary to close the bridge to vehicular traffic. The normal working hours will be between 8am and 4pm Mondays to Fridays. Provided that the weather remains reasonable, it is estimated that the work will take up to three weeks to complete.
When the bridge is closed, traffic will be diverted via the B4368 and local roads by a signed diversion route. Access over the bridge for pedestrians and dismounted cyclists will remain available throughout the proposed work.
The work will be carried out by the council’s term maintenance contractor, Kier, with supervision being provided by WSP on behalf of Shropshire Council.
Steve Charmley, Shropshire Council’s Cabinet member for physical infrastructure, highways and built housing, said:-
“I apologise in advance that there will inevitably there will be some disruption during these works. We will always endeavour to minimise any inconvenience to roadusers; however, a full closure will be in effect for the duration of the work.”